The 3 levels of Building Information Modelling (BIM) maturity explained in simple terms! (including BIM Level 2 and BIM Level 3). Lots of people talk about the different levels of BIM, but what do they actually mean? Well the levels run from 0-3 and are used as measures of BIM maturity; that is the construction supply chain’s ability to operate and exchange digital information.
Level 0 is essentially the use of computer aided design (or CAD tools) to create drawings and drawn elements using IT sof
آی-ویدئو